Benefits of using Hyve for Colocation
Technical
Facility
- 200,000 sq ft of net technical space
- 60,000 sq ft of ancillary space including offices, test rooms and disaster recovery suites
High-density solutions from 1000 to 2500 watts per sq m - 24 x 7 x 365 building operation
• 750mm raised floor Power
• Utility power supplied via 2 x 132kV incomers (dual 84MVA) - Dedicated critical power infrastructure in an N+N, N+1 or to customer configuration
- Back-up generators
- Refuelling contracts to ensure timely fuel replacement
Connectivity
- Access to multiple telecommunication/
- Diverse cable routing into facility
- Diverse cable routing through raised floor to each suite
- Strict cable management policy
- 2 dedicated Meet Me Rooms (MMR)
Cooling
- Dedicated chilled water system to customer environment
- Dedicated critical environmental controls including Air handling units and BMS system
- Humidity regulation via rooftop air handling units
- Minimum N+1 redundancy on all free cooling systems and DX options available
Fire Detection & Suppression
- Three-stage fire detection systems in all plant areas
- VESDA (Very Early Smoke Detection Apparatus)
- Fire detection in all rooms, below raised floors and in ceiling voids
- Double interlocked pre-action gas suppression to technical areas
- Fire detection and suppression systems interconnected to central BMS
Security
- 24 x 7 x 365 on-site security
- Door access controls at site and building entrances
- Proximity cards to authorise access levels including mantrap access
- External and internal CCTV
- Intruder detection alarms
- Vehicle lock to site entrance
- X-ray scanners
Trustpilot Hyve Managed Hosting Customer Reviews 2019
Hyve are 100% carbon neutral. We use carbon offsetting to balance out the release of carbon dioxide from our offices and infrastructure.